bug Doing Business with Boeing
Doing Business Home
 
Closespc
BDS Common Terms and Conditions

Deactivated Quality Clauses
Note 1: Deactivated = clause cannot be added to any new purchase contract(s)/purchase contract change(s)

Return to Active Quality Clauses
Q001 - Q199
  Clause Title Effective Date Comments
  Q005 Boeing Quality Management System (BQMS) Requirements: Appendix B, "Inspection and Test Quality System" and Addendum 1, "Advanced Quality System (AQS) Continuous Improvement" 11/11/03 Deactivated Pre-2014
Boeing Quality Management System (BQMS) Requirements Appendix B and Addendum 1 10/01/01
  Q006 Boeing Quality Management System (BQMS) Requirements: Appendix B "Inspection and Test Quality System" 11/11/03 Deactivated Pre-2014
Boeing Quality Management System (BQMS) Requirements Appendix B 10/01/01
  Q006S Report A0436 and AS9003, Inspection and Test Quality System 06/05/08 Deactivated Pre-2014
Report A0436 and AS9003, Inspection and Test Quality System 08/01/05
  Q007 ISS Quality System Supplement 11/23/05 Deactivated 09/22/16
International Space Station Program Supplement to BQMS Appendix A -- Rev 12/14/01 12/14/01
  Q008W Software Quality Requirements For Airborne Systems And Equipment -- Deliverable 11/23/05 Deactivated 09/18/17
  Q009O ISO 9001 Quality Management Systems -- Requirements 05/12/05 Deactivated Pre-2014
  Q010MM Seller's Quality Control Requirements - Material / Standard Part Certification - Deliverable 06/05/08 Deactivated 08/27/15
  Q010S Seller's Quality Control Requirements -- Tubes 11/23/05 Deactivated 04/04/18
  Q011P Supplemental Quality Assurance Requirements 02/03/10 Deactivated 11/05/14
02/20/09
11/03/04
  Q014 Rebuild or Alteration - FAA Approved Production Approval Holder (PAH) Requirements -- Deliverable 03/03/08 Deactivated 09/20/17
  Q015W Buyer Approved Quality System -- Repair Station Requirements 02/07/05 Deactivated 07/22/16
  Q016W Buyer/Regulatory Agency Approved Repair Station -- FAR 14CFR145.217 Requirements 02/07/05 Deactivated 09/18/17
  Q021S5 Flight Safety Program / Production Plan -- AH-64 Program -- Deliverable 11/23/05 Deactivated 04/04/18
  Q022S5 Flight Safety / Critical Item Control -- AH-64 Program -- Deliverable 11/23/05 Deactivated 11/17/17
  Q026P Record As-Built Configuration On Shipping Document 02/16/11 Deactivated 11/02/16
04/18/05
  Q027 Engineering Dataset/Drawing Information (Variable) 02/16/11 Deactivated 03/03/16
04/18/05
10/01/01
  Q027P Engineering Dataset/Drawing Information (Variable) 02/16/11 Deactivated 01/21/16 Use Q028
04/18/05
  Q029H Digital Product Definition (DPD) / Model Base Definition (MBD) 05/14/04 Deactivated 04/04/18
  Q030K Manufacturing Plan Required 08/22/05 Deactivated 11/17/17
  Q042 Sub-purchase order/contract Fabrication 10/01/01 Deactivated 04/04/18
  Q045 Supplier Funded Supplemental Inspection (SFSI) 02/04/16
Deactivated 07/22/16
09/14/15
04/21/15
  Q047V Source Inspection Plan (SIP) - Deliverable 12/15/05 Deactivated 07/22/16
  Q048 United Space Alliance Customer Source Inspection -- Space Program Operations Contract 06/20/08 Deactivated 07/22/16
03/16/05
06/05/02
  Q048S Designated Customer Representative Inspection 05/12/05 Deactivated 07/22/16
  Q052 Boeing Final Source Inspection 10/01/01 Deactivated 12/22/16
  Q054 Boeing Quality Surveillance 10/01/01 Deactivated 10/15/14 Use Q053
  Q057 Inspection Control Point Outline (Mandatory Inspection Points)(MIPs) 10/01/01 Deactivated 07/19/14 Use Q053
  Q057V Buyer's Mandatory Inspection Points 12/15/05 Deactivated 06/10/14 Use Q051 or Q053
  Q059W Buyer And FAA Conformity -- Seller / Subcontractor -- Deliverable 11/23/05 Deactivated 11/17/17
  Q060W NREE Conformity Request and FAA Form 8130-9 -- Deliverable 08/01/05 Deactivated 09/18/17
  Q061K FAA Statement Of Conformity -- NATDelegated -- Deliverable 05/12/05 Deactivated 09/18/17
  Q062K FAA Authorized Release Certificate -- Aviation Certification Consulting -- Deliverable 05/12/05 Deactivated 09/18/17
  Q064W Buyer FAA Conformity -- Seller / Subcontractor -- Deliverable 11/23/05 Deactivated 09/18/17
  Q068K Seller's First Article Inspection Requirement With Boeing First Article Inspection (BFAI) and Deliverable Report 02/07/05 Deactivated Pre-2014
  Q069K Seller's First Article Inspection Requirement and Deliverable Report 02/07/05 Deactivated Pre-2014
  Q070 First-Piece Inspection 10/01/01 Deactivated Pre-2014
  Q071S AS9102 Aerospace First Article Inspection Requirement with Boeing First Article Inspection (BFAI) - Deliverable Report 06/19/15 Deactivated Pre-2014
01/29/10
  Q072 First Article Inspection Deliverable 06/19/15 Deactivated 12/17/15
02/11/13
AS9102 Aerospace First Article Inspection Requirement - Deliverable Report 05/31/06
AS9102 Aerospace First Article Inspection Requirement and Deliverable Report 04/21/04
First Article Inspection (By Seller Only) 12/10/02
  Q072S AS9102 Aerospace First Article Inspection Requirement - Deliverable Report 06/19/15 Deactivated Pre-2014
01/29/10
  Q073 First Article Inspection 06/19/15 Deactivated 12/17/15
02/11/13
AS9102 Aerospace First Article Inspection Requirement 04/21/04
  Q091L Seller / Manufacturer Certificate of Conformance - Deliverable 11/18/13 Deactivated 08/06/15 Use 090 or Q091
05/21/10
  Q091P Certificate Of Conformance -- Deliverable 01/05/10 Deactivated 08/06/15
05/31/06
Certificate of Conformance 03/16/05
  Q091V Certificate Of Conformance - Deliverable 12/15/05 Deactivated 08/06/15 Use 090 or Q091
  Q092W Material Certification 02/07/05 Deactivated 08/06/15 Use 090 or Q091
  Q093 Certification of Compliance 10/01/01 Deactivated 08/06/15 Use 090 or Q091
  Q094 Certification of Compliance 10/01/01 Deactivated 08/06/15 Use 090 or Q091
  Q101 Certificate of Conformance for Subassembly Details 03/11/09 Deactivated 08/06/15 Use 090 or Q091
  Q102 Certificate of Solderability 10/01/01 Deactivated 09/18/17
  Q104 Testing of High-Strength Fasteners 10/01/01 Deactivated 04/04/18
  Q104S Quantitative Test Results 02/07/05 Deactivated 07/22/16
  Q111 Certification of Conformance, Same As Direct Sales - Deliverable 01/13/10 Deactivated 08/06/15 Use 090 or Q091
  Q116 Traceability Data -- Subassembly 10/01/01 Deactivated 04/04/18
  Q116S3 Data Package Item E-54.18e - F/A-18 -- Deliverable 11/23/05 Deactivated 08/06/15
  Q134 EEE PRECAP Inspection 10/01/01 Deactivated 10/15/14 Use Q053
  Q140 Shipping to Destination other than Boeing's 10/01/01 Deactivated 11/17/17
  Q141PP Seller Drawing/Catalog -- Deliverable 06/03/05 Deactivated 09/22/16
04/18/05
  Q150 Process Validation Assessment 09/21/06 Deactivated Pre-2014
  Q150P Process Validation Assessment (PVA) 11/03/04 Deactivated Pre-2014
  Q150S Process Validation Assessment 11/03/04 Deactivated Pre-2014
  Q150V Process Validation Assessment 12/15/05 Deactivated Pre-2014
  Q150W Process Validation Assessment 09/15/04 Deactivated Pre-2014
  Q151 Buyer's Source Inspection - Precedence 06/20/08 Deactivated 10/30/14
Process Validation Assessment - Precedence 09/21/06
  Q151W Limited Process Validation Assessment 09/15/04 Deactivated Pre-2014
  Q171P Grain Flow Marking 04/18/05 Deactivated 07/22/16
  Q172P Commingling of Items 02/16/11 Deactivated Pre-2014
04/18/05
  Q181W Requirements For Sellers Of Special Tools 12/15/05 Deactivated 04/04/18
  Q185 Quality Requirements Review 09/01/11 Deactivated Pre-2014
01/05/10
09/17/07
08/25/06
  Q185H Post Award Quality Conference 04/24/06 Deactivated Pre-2014
Back to top
Q200 -- Q299
  Clause Title Effective Date Comments
  Q200S Government Direct Ship Acceptance 03/18/09 Deactivated 06/10/14
  Q201 Government Source Inspection Requirements (NASA contracts -- Station Program) 04/19/01 Deactivated Pre-2014
  Q202 Government Source Inspection Contracts (SSME Program) 06/04/01 Deactivated Pre-2014
  Q203 Boeing Source Inspection 01/24/03 Deactivated Pre-2014
  Q205P Seller's Inspection / Acceptance Stamps for Procured Items 04/18/05 Deactivated 09/23/16
  Q206 Government Source Inspection 09/19/01 Deactivated 10/07/14 Use Q049
  Q206W Government Source Inspection With DD Form 250 (Variable Clause) 11/03/04 Deactivated 10/07/14
  Q207 Physical and Chemical Test Reports Identified to Specific Lots 04/27/01 Deactivated 04/04/18
  Q208 Evidence of Compliance with Reliability Verification Provisions 04/27/01 Deactivated Pre-2014
  Q210 Supplier Designed Drawing Request (For Standard Catalog Hardware Only) 12/09/02 Deactivated 09/20/17
  Q212 Commercial Material Certification Identification 12/10/02 Deactivated 11/17/17
Material Certification Identification 04/27/01
  Q213 Oxygen Compatibility Testing 04/27/01 Deactivated Pre-2014
  Q214 Change Control of Baseline Documents Contract Grouping Specification SSME (RL00144) or (RL10101) 04/27/01 Deactivated Pre-2014
  Q215 Records (SSME Program -- Purchased Labor Use Only) 08/06/01 Deactivated Pre-2014
  Q216 Weld Repairs of Castings 07/16/01 Deactivated Pre-2014
  Q218 Metallic -- Materials Acceptance Testing -- Canoga Park 04/21/04 Deactivated Pre-2014
  Q219 Material Review Record Inspection Discrepancy and Correction Record (IDCR) 04/27/01 Deactivated Pre-2014
  Q219W4 Material Review (MR) Limitation - Connexion Program -- Deliverable 11/23/05 Deactivated Pre-2014
  Q220 Nondestructive Test Documentation Requirements SSME Program 04/19/02 Deactivated Pre-2014
  Q221 Special Procurement Quality Assurance Requirements 04/27/01 Deactivated Pre-2014
  Q223 QA -- Nondestructive Test (NDT) Source Inspection 01/24/03 Deactivated Pre-2014
  Q226 Space Station Product Assurance Requirements 07/16/01 Deactivated Pre-2014
  Q228 Inspection Requirements -- SSME Program Only 11/22/02 Deactivated Pre-2014
  Q229 Inspection Record Retention (SSME Program) 08/27/01 Deactivated Pre-2014
  Q232 Special Procurement Quality Assurance Requirements For Non-SSME Program Hardware 09/20/01 Deactivated Pre-2014
  Q233 Nondestructive Inspection for Space Station Hardware 10/16/01 Deactivated Pre-2014
  Q235 Characteristic Risk Analysis / Characteristic Accountability Worksheet -- SSME Program Only 11/22/02 Deactivated Pre-2014
  Q236 Space Station EEE Hardware -- Evidence of Lot Date 04/30/01 Deactivated 09/21/17
  Q237 Requirements for Printed Wiring Boards/Flex Circuits (RS68 Program Only) 06/14/01 Deactivated 09/21/17
  Q238 Requirements for Process Producibility
Analysis (PPA) Testing of Multilayers (RS68 Program Only)
06/14/01 Deactivated 09/21/17
  Q239C Non-Metallic Materials Acceptance Testing -- Canoga Park 02/07/05 Deactivated Pre-2014
06/21/04
  Q243 Tool Accuracy Requirement 08/21/01 Deactivated 11/17/17
  Q271 AS9102 Aerospace First Article Inspection Requirement with Boeing First Article Inspection (BFAI) and Deliverable Report -- Canoga Park 04/21/04 Deactivated Pre-2014
  Q272S1 Quality Assurance Requirements -- Buy-To-Packages -- SDB Program 11/23/05 Deactivated 09/21/17
  Q273S1 Quality Assurance Requirements -- Build-To-Packages -- SDB Program 11/23/05 Deactivated 09/21/17
  Q275SS Just In Time Panstock Requirements 11/23/05 Deactivated 07/22/16
  Q275W AQAP-110 Supplement To BQMS Appendix A -- Deliverable 11/23/05 Deactivated 09/21/17
  Q276W AQAP 120 Supplement To BQMS Appendix A -- Deliverable 11/23/05 Deactivated 11/17/17
Back to top
Q300 -- Q399
  Clause Title Effective Date Comments
  Q300P Seller Use of Electronic Supplier Corrective Action Notice (E-SCAN) 07/02/07 Deactivated Pre-2014 Use Q300
Seller Use of Buyer's Corrective Action Request System 04/18/05
  Q303 Procurement Control Drawing Information 04/26/01 Deactivated Pre-2014
  Q304 Production Drawing Information 04/26/01 Deactivated Pre-2014
  Q305 Seller Inspection Requirements 04/26/01 Deactivated Pre-2014
  Q309 Weight Verification Certificate (WVC) 04/26/01 Deactivated Pre-2014
  Q311K "ACN" Requirement Prior To Shipment 08/22/05 Deactivated 09/21/17
  Q311P Qualification Status Report 04/18/05 Deactivated 11/02/16
Back to top
Q400 -- Q499
  Clause Title Effective Date Comments
Back to top
Q500 -- Q599
  Clause Title Effective Date Comments
  Q501S Capacitor Solderability Requirement 11/23/05 Deactivated 07/22/16
  Q502 Certification of Conformance and Traceability of Origin -- Semiconductors, Diodes, and Transistors (MIL-PRF-19500), and Microcircuits (MIL-PRF-38535 and MIL-PRF-38534) 01/31/03 Deactivated 08/06/15 Use 090 or Q091
  Q505 Supplier Product Inspection Report 01/31/03 Deactivated 09/21/17
  Q506 Supplier Product Inspection Report -- Electrical Wire 01/31/03 Deactivated 09/21/17
  Q506O Cable Preparation for Delivery 07/05/05 Deactivated 09/21/17
  Q507 Evidence of Inspection and Tests Performed for Electrical Connectors 01/31/03 Deactivated 04/04/18
  Q508 Seller Microcircuit and Semiconductor Diffusion Lot Traceability Requirements 01/31/03 Deactivated 11/17/17
  Q509 Buyer Quality Surveillance 01/31/03 Deactivated 10/25/17
  Q510 Change Notification 01/31/03 Deactivated 10/27/17
  Q511 Deliverable Test Data Requirements 01/31/03 Deactivated 09/21/17
  Q512 Date of Manufacture Restriction 01/31/03 Deactivated 04/04/18
  Q513 100% Source Inspection Verification Requirement 01/31/03 Deactivated 06/10/14 Use Q051 or Q053
  Q513H 100% End Item Inspection Requirement -- Form #X32038 03/16/05 Deactivated Pre-2014
  Q514 DELTA Data Requirements 01/31/03 Deactivated Pre-2014
  Q515 Electronic Parts Date of Manufacture Restriction 3/21/03 Deactivated 04/04/18
  Q537KK "Hole Definitions -- Part Configuration Standardization" 08/22/05 Deactivated 09/21/17
  Q538 Outside Production Service - Work Order Completion Requirements -- Deliverable 07/31/09 Deactivated 09/21/17
Back to top
Q600 -- Q699
  Clause Title Effective Date Comments
Back to top
Q700 -- Q799 (reserved)
  Clause Title Effective Date Comments
Back to top
Q800 -- Q899
  Clause Title Effective Date Comments
  Q800 Quality Assurance Requirement 03/06/01 Deactivated 09/21/17
  Q801 Government Source Inspection (GSI) 03/06/01 Deactivated Pre-2014
  Q802 The Boeing Company Source Inspection 03/06/01 Deactivated 07/22/14 Use Q053
  Q806 First-Article Inspection at The Boeing Company 03/06/01 Deactivated Pre-2014
  Q812 General Quality Assurance Requirements 03/06/01 Deactivated 09/21/17
  Q814 General Quality Assurance Program/System Requirements 03/06/01 Deactivated 10/18/17
  Q815 Space Station Program (SSP) Quality Assurance Requirements: SSP 41173 03/06/01 Deactivated 10/18/17
  Q816 Machined Part Inspection 03/06/01 Deactivated 11/17/17
  Q817 Inspection Control Point Outline (Mandatory Inspection Points)(MIPs) 03/06/01 Deactivated 06/10/14 Use Q053
  Q818E Buyer's In-Process & Final Source Inspection Required - Deliverable 04/26/11 Deactivated 08/27/14
Please Use Q818
01/29/10
  Q819E Buyer's Final Source Inspection Required - Deliverable 04/26/11 Deactivated 08/27/14
Please Use Q053
01/29/10
  Q820E Buyer-s In-Process Source Inspection Required - Deliverable 04/26/11 Deactivated 08/27/14
Please Use Q818
01/29/10
  Q829 Certified Weld Inspector (CWI) Requirements 03/06/01 Deactivated 10/18/17
  Q830 Certificate of Compliance (C of C) 03/06/01 Deactivated 08/06/15 Use 090 or Q091
  Q835 Disposition of Nonconforming Material – MD-1898 04/01/14 Deactivated 04/04/18
  Q836P Rejection Report -- Copy Required (Variable) 04/18/05 Deactivated 06/03/16
  Q838 Tooling Inspection and Reports by Seller 03/06/01 Deactivated 11/17/17
  Q839 ISO 9000 Series 03/06/01 Deactivated 10/18/17
  Q859 Tooling Inspection at Sellers 03/06/01 Deactivated 06/10/14 Use Q053
  Q862 The Boeing Company Quality Surveillance 03/06/01 Deactivated 06/10/14 Use Q053
  Q864 NASA Handbook (NHB) 5300.4 (1B) 03/06/01 Deactivated 10/18/17
  Q875 NASA Handbook (NHB) 5300.4 (1C) 03/06/01 Deactivated 10/18/17
  Q877 Description of Shipping Documents 03/06/01 Deactivated 10/18/17
  Q892 NASA Handbook (NHB) 5300.4(1D2) 03/06/01 Deactivated 10/18/17
  Q893 Cleanliness and Packaging Requirements 03/06/01 Deactivated 11/20/17
  Q894 National Association of Corrosion Engineers (NACE) International Certified Coating Inspector Certification 03/06/01 Deactivated 10/18/17
  Q895 EEE Parts Procurements 03/06/01 Deactivated 10/18/17
  Q896 Generally Clean (GC) 03/06/01 Deactivated 10/18/17
  Q899 Special Quality Assurance Clause Requirements 03/06/01 Deactivated 10/18/17

Back to top

Q900 -- Q999
  Clause Title Effective Date Comments
  Q915 Compliance With SQAR-100B 10/01/01 Deactivated 10/18/17
  Q921 Buyer's Review of Radiographic Film 10/01/01 Deactivated 10/18/17
  Q924   Process Validation Assessments (PVA) 04/26/05 Deactivated Pre-2014
03/16/05
10/01/01
  Q926K Delegation of Inspection Authority 10/30/09 Deactivated Pre-2014
Delegation of Inspection Authority 08/04/08
Delegated Source Inspection 08/22/05
  Q930 Integrated Process and Product Control (IPPC) 09/21/01 Deactivated 10/18/17
  Q931 Process Control Assessment (PCA) 04/24/02 Deactivated 10/18/17
  Q932 Process-Product Integrity Assessment (PPIA) 06/06/02 Deactivated 10/18/17
  Q940 Evidence of Compliance With Material and Process Specification 10/01/01 Deactivated Pre-2014
  Q961 Hardness Test Requirements 04/11/01 Deactivated 11/17/17
  Q963 Embrittlement Relief 05/23/01 Deactivated 10/18/17
  Q964 Stress Relief 05/23/01 Deactivated 10/18/17
  Q966P Identification of Test Items 04/18/05 Deactivated 07/10/17 Use Q966
  Q969 Statistical Process Control 10/01/01 Deactivated 10/18/17
  Q970 Data Review Requirements 10/01/01 Deactivated 04/04/18
  Q971 Critical Attach Hardware Identification 05/14/01 Deactivated 04/04/18
  Q972 Flight Critical Item Identification 05/14/01 Deactivated 04/04/18
Back to top
 
Close

Site Terms | Privacy Policy | Contact Us
Copyright © The Boeing Company - All rights reserved Security Agreement